Skip to main content

Hand a Case over to the next shift

A Case appears on the handover sheet only when an analyst hands it over. Do it from the Case page, so that the note is written where you are working.

Role needed: Edit and submit handover drafts, and you must be able to see the Case. The menu item is shown to roles with Take part in handovers.

Before you start: the outgoing shift must have an open handover. See Prepare and submit a handover.

Hand a Case over​

  1. Select Case Management in the navigation menu and open the Case. See Work the Case queue.
  2. In the Case header, select More actions (the three vertical dots) and choose Handover Case. It reads Handover Case (already on this handover) when the Case is already on the open handover.
  3. In the Handover Case panel, enter a Reason, which says why the Case is handed over, and a Note, which says what the next shift needs to know. Both are required.
  4. Optionally enter an Expected next action (optional) and choose a Receiving analyst (optional).
  5. Select Hand over case. The console shows "Case added to the handover".

To check the result, open Shift Operations: the Case is listed in Cases to Hand Over on the sheet.

If no handover is open, the panel says "No handover is open. Start one from Shift Operations first." Start one as described in Prepare and submit a handover. If the panel says "The open handover can no longer be edited.", the handover has already been submitted. If the Case must be added, ask the incoming lead to return the handover first. For other messages, see Shift Operations problems.

If the Case is already on the handover, its existing entry is shown, the button reads Update entry, and saving updates it instead of adding a second one. A Case can be taken off the handover with the bin icon in Cases to Hand Over while the handover is editable.

What the handover does to the Case​

The note is recorded on the handover and once on the Case timeline, labelled Handed over. Handing a Case over never closes it, never approves a response action and never changes its owner. The owner changes only when a named receiving analyst accepts responsibility; see Accept, return or close a handover.

On the sheet, Cases are shown by their number, such as OPS-42.

Next steps​